References

  • Technical consultancy of FMT Aircraft Gates Support Systems AB (manufacturer of PBB)
  • Construction management, planning and setting up of all new PBB of the extension of Munich’s terminal 2 (“Satellite-terminal”)
  • Restructuring of all PBB floors at Munich’s terminal 2
  • Planning and setting up of a combined emergency stop system for PBB and GPU at Munich’s terminal 2
  • Planning and realizing of reinforcement works on all PBB at Munich’s terminal 2 while airport was fully operated
  • Modifying and reconstructing of hydraulic systems of PBB at the extension of Munich’s terminal 2 (“Satellite-terminal”)
  • Constructing and setting up of a personal damage avoiding system at the undercarriage of PBB (so called “safety-belt”) at Munich’s terminal 2
  • Planning, constructing and modifying of universal docking adapters for PBB cabins at Munich’s terminal 2
  • Full maintenance of all PBB at Munich’s terminal 1
  • Full maintenance of all GPU at Munich’s terminal 1
  • Full maintenance of all PBB at Munich’s terminal 2
  • Full maintenance of all GPU at Munich’s terminal 2
  • Full maintenance of all PBB at the extension of Munich’s terminal 2 (“Satellite-terminal”)
  • Full maintenance of all GPU at the extension of Munich’s terminal 2 (“Satellite-terminal”)
AESP Potoku